Rapid Pre-Bid Support Achievement

GreenOps efficiently delivered pre-bid support for Solar + BESS + DG project, producing over 50 engineering drawings & documents within a demanding 7 days timeframe.
How to size Battery Energy Storage Systems?

GreenOps used properitory models/Softwares to size the battery to get firm power for 8 hours from a solar + BESS Project
Why Hybrid Projects?

Hybrid projects can be customized to suit specific needs and environments, allowing for flexibility in energy generation based on factors like weather conditions and energy demand fluctuations.
Optimizing Microgrid System with Solar PV + DG + BESS

Check how GreenOps helped Powering of water pumps in remote area of Malawi with PV + DG + BESS Solution
A round the clock renewable energy solution

GreenOps has done complete Detailed engineering for Wind Solar Hybrid project, which was commisioned in June 2023 and providing round the clock power.